INDUSTRIAL PROJECTS CONTROLS & MANAGEMENT

 

PLANNING UNDER PRIMAVERA P6 & RISK ANALYSIS

SKILLS IN PROJECTS CONTROLS, MANAGEMENT & SUPERVISION

 

My Key Responsabilities and among others I  :

  • Provide from scratch with focus on the successful execution on time in accordance with their requirements, specification and standards using :

    • Create and maintain comprehensive project schedules using appropriate planning tools.

    • Coordinate with project teams to ensure alignment on project timelines and milestones.

    • Identify potential delays and provide solutions to mitigate schedule risks.

 

  • Perform the project’s COST ESTIMATION and MANAGEMENT with the PMT :

    • Develop detailed cost estimates for the project during the tendering phase.

    • Analyze project specifications and requirements to provide accurate and competitive pricing.

    • Monitor and manage project budgets, ensuring cost control measures are in place.

 

  • Follow-up the project’s TENDER DOCUMENTATION :

    • Prepare and review tender documents, ensuring all financial and scheduling aspects are accurately represented.

    • Collaborate with the procurement team to develop bid strategies and optimize costs.

    • Ensure all tender submissions comply with client requirements and industry standards.

 

  • Follow-up the STAKEHOLDER MANAGEMENT :

    • Liaise with clients, contractors, and project teams to gather necessary project information.

    • Maintain effective communication with all stakeholders to ensure clarity on project scope and objectives.

    • Provide regular updates on cost and schedule status to project leadership and clients.

 

  • Perform the RISK MANAGEMENT using PRIMAVERA RISK ANALYSIS:

    • Identify and assess potential risks related to cost and scheduling during the tendering phase.

    • Develop risk mitigation strategies and contingency plans.

    • Monitor risk factors and adjust plans as necessary to ensure project success.

 

OIL & GAS SECTOR REFERENCES

 

   MOHO NORD Project / TOPSIDES TLP & FPUULSAN (South Korea)

Assist the TLP-FPU PCL Planner-Reporter with regard to the two contracts TLP & FPU and tightly liaise with the Construction Managers to:

  • Coordinate transverse construction activities for all yards with dedicated reporting to TLP-FPU management in the event of identified deficiencies or critical problems

  • Crosscheck internal and external construction interfaces, monitor key dates in order to meet project milestones

Assist the TLP-FPU management to identify any actual or future slippage or blocking points in work progress.

 

   OFFSHORE OFON 2 Project / TOPSIDES - ULSAN (South Korea)

  • Follow-up of the planning and reporting to the STR & PVV Lead;

  • Checking of the daily production schedule;

  • Ensure the successful completion of the modules’ construction operations in compliance with engineering documents, procedures, safety and environmental protection.

 

  FLUXYS VTN II Compressed gas projectBelgium

Construction Management within the context of the LNG reinforcement pipeline’s construction, management of the bypass and interruption stations erection.

 

  ONSHORE / OFFSHORE ANGUILLE REDEVELOPMENT PORT-GENTIL Gabon

Structure and PVV Supervisor within the context of the offshore ANGUILLE & TORPILLE electrification redevelopment and as part of the project team, directing all phases of structure and piping construction.

 

   YEMENI LNG Project BALHAF – Yemen

  • Follow-up of the planning and reporting to the Site Planning Manager.

  • Supervision for the preparation, prefabrication and erection of piping on site (GRP/SS/CS/LTCS);

  • Monitoring and checking of the material.

 

   SHELL REFINERY REICHSTETT - France

Supervision of the pipe working within the context of the “Unité 700” reconstruction after sinister.

 

   ROD LNG PROJECT (RHOUDE OULAT DJEMA)(Sahara) Algeria

  • Supervision of the pipe working and follow through of the test packs.

  • Checking the works progress under the Site Manager’s representative authority.

 

   TOTAL REFINERY GRAND-PUITS - France

  • Supervision of revamping three “FIVES” boilers and high-pressure pipes;

  • Follow-up and coordination of the materials delivery;

  • Coordination of the subcontractors;

  • Checking the works progress in parallel with the Site Manager’s representative.

 

 

HEAVY INDUSTRY SECTOR REFERENCE

   ARCELORMITTAL Mardyck – France

Within the new site construction, site dedicated to the electrical steels production on 5 lines:

  • Initialize the framework, the baseliner EPCC planning;

  • Support to the development of project Work Breakdown Structure and Cost Breakdown Structure;

  • Detail scheduling of project activities and support for the budget / forecast preparation;

  • Integrate detailed contractors’ schedules into the project schedule and identify critical path activities.

 

 

NUCLEAR SECTOR REFERENCE

   GE / EDF BELFOR - France

Within the new nuclear site’s construction (4 x BDM & 2  x BDR), also EPR2 (European Pressurised water Reactor 2) projects:

  • Take part to the framework and master EPCC planning initialization;

  • Take pat to the baseline planning initialization;

  • Support to the development of project Work Breakdown Structure and Cost Breakdown Structure;

  • Detail scheduling of project activities and support for the budget / forecast preparation;

  • Integrate detailed contractors’ schedules into the project schedule and identify critical path activities.

 

 

LIFE SCIENCES & DATA CENTER SECTOR REFERENCES

 

   Projet X (Confidential agreement) Mons - Belgium

Within GBL3 & GBL4 Data Center Campus projects:

  • Initialize and provide BMS and Fire Alarm construction planning’s;

  • Handling weekly and monthly construction curves and analysis;

  • Critical Path Analysis, highlighting deviations & recommending corrective actions;

  • Managing Earn Value Curves.

 

   YPOSKESI B3 NEW SITE CONSTRUCTION CORBEIL-ESSONNES – France

Within SKY (SK Holdings & YPOSKESI) B3 pharmaceutical project:

  • Initialize the master EPCC& Q planning;

  • Support to the development of project Work Breakdown Structure and Cost Breakdown Structure;

  • Detail scheduling of project activities and support for the budget / forecast preparation;

Integrate detailed contractors’ schedules into the project schedule and identify critical path activities

 

 

AGRO-INDUSTRIAL SECTOR REFERENCE

 

   SOSUCAM SUGAR REFINERY N’KOTENG - Cameroon

  • Follow through of the rehabilitation's works of the sugar refinery;

  • Checking of the installation drawings;

  • Follow-up and coordination of the materials order and delivery;

  • Follow-up of the manufacturing in workshops and blank assembly;

  • Follow-up of the packaging and dispatching.

 

 

WATER & RENEWABLE ENERGY SECTOR REFERENCES

 

   OFFSHORE WINDFARM PROJECT SAINT-NAZAIRE – France

  • Initialize and provide the Liner EPC L3 planning’s;

  • Initialize and provide the WPS EPC L3 planning’s

 

   WASTE WATER TREATMENT PLANT; RAS LAFFAN INDUSTRIAL CITY - Qatar

Supervision of the Waste Water Treatment Plant construction within the Ras Gas onshore expansion project phase II (RGX2).

 

   WASTE WATER TREATMENT PLANT AS SAMRA – Jordan

Within the context of the new plant’s construction:

  • Follow through of the planning and reporting to the Construction Manager;

  • Supervision for the preparation, prefabrication and erection of piping, mechanical and rotating equipment’s on site.

This EPC project is financed by USAID.

 

   PURIFICATION STATION (SIAAP) VALENTON - France

  •  Coordination and follow-up of the pipe working on the new purification station site;

  • Supervision and management of 3 foremen and 55 peoples including their mobilization and demobilization.

 

   CHEMICAL SITE INTEROR CALAIS - France

  • Supervision and coordination of the complete construction of a new purification station;

  • Supervision of the revamping works in the existing purification station.

 

   CHEMICAL SITE RHOM & HAAS CHAUNY - France

  • Supervision and coordination of the rehabilitation's works of the existing purification station;

  • Follow-up and coordination of the materials delivery;

  • Interface with the Client and Follow trough of the planning and reporting to the Company.

 

 

AUTOMOBILE SECTOR REFERENCES

 

   RENAULT FASA CAR MANUFACTORY VALLADOLID – Spain

  • Follow through of the filtration stations setting up;

  • Checking of the installation drawings;

  • Working out of the jobs descriptive, involvement in the negotiations and dealing with subcontractors. 

 

   PEUGEOT CAR MANUFACTORY (Centre de production de Mulhouse) - France

  • Supervision and coordination of the complete construction of the new conveyors and production lines for the vehicle 307;

  • Involvement in the new assembly line's creation;

  • Involvement in the negotiations and dealing with the subcontractors.

​

 

 